海事安全信息  |  联系我们  |  手机版
欢迎光临海图在线,请登录  免费注册
首 页 新闻资讯 产品与服务 在线订购 下载中心 我的帐户 客户支持 合作伙伴 关于我们
新闻资讯
新闻资讯
电子图书出新通告 (2022.7.29)
分享到  0
文章来源:海图在线 发布时间:2022-07-29 10:08:13访问次数:1197

电子图书出新通告 (2022.7.29)

SeaReader电子阅读器为海上使用提供了一个完整的数字海洋技术库。它以易于使用的数字格式提供船上所需的所有书籍。它消除了维护纸质图书馆的相关成本和管理,因为所有数据都始终在容器上。此外,只需单击一个按钮,整个库就可以轻松更新。你甚至不需要在线更新数字图书馆。在船舶检查时,SPICA电子阅读器通过在船上提供所有强制性出版物,使检查变得简单,并确保合规性。有关IMO关于船舶出版物运输要求的更多信息和指南,请阅读MSC-MEPC.2/Circ.2

要使用多种数字出版物,请查看我们的软件SeaReader电子阅读器.

书名Heavy Lift & Project Cargo Operations

An Introduction

 

出版社 - Mike Wall & Associates

版本号 - 1st Edition

语言 - English

书号 - MWA2010A
There are many different types of heavy lift and project cargo operations (HLPCO) carried out on a day to day basis around the world. These can range significantly in size, shape and distance to be transported. They can involve various types of equipment which require specific skills to be able to operate them effectively, efficiently and safely.

 

All heavy lift and project cargoes need to be transported from the place of construction to the final installation site. When the place of manufacture is some distance from the site there will need to be some form of horizontal and/or vertical heavy lift transport by rail, road or sea. This will entail extensive planning, often involving expensive specialist equipment operated by teams of highly skilled personnel.

The book introduces the reader to the theoretical and practical aspects of such activities, eg, rigging and stability aspects of lifting, transporting and loading out heavy loads. It also deals with risk assessments, safe working practices and legal apects relating to these operations. It is intended for those wishing to enter heavy lift and project cargo operations and those who may be intending to become surveyors in this field of cargo operations.

 

 

书名Bridge Team Management

A Practical Guide

 

出版社 - The Nautical Institute

版本号 - 2nd Edition

语言 - English

书号 - NIS0091B / NIS0091B(MEM)
An industry standard for passage planning, the guide covers practical coastal and estuarial navigation and bridge organisation for use on both paper and electronic charts. There is detailed information on preparing a navigational plan and navigators notebook and ways to monitor progress in safe water. Other chapters cover team management, error chains, casualties and causes, bridge organisation, passage appraisal, situational awareness and executing the plan.

 

更多信息请联系:

北京思拓海洋信息技术有限公司

北京市丰台区汽车博物馆东路 6 号院盈坤世纪大厦 F 座 405 室

电话:010 62680730

传真:010 62681683

邮箱:sales@enclive.cn

网址:www.enclive.cn

如有任何问题请您第一时间联系我们
北京思拓海洋信息技术有限公司
电话:010-62680730
传真:010-62681683
邮箱:sales@enclive.cn
网址:www.enclive.cn
FTP: ftp.enclive.cn
(用户名:public_situo 密码:situo123321)
产品与服务 >> 官方电子海图 系统电子海图 互联网电子海图 电子潮汐表 航海通告
网站首页  |  联系我们  |  许可条款  |  购买条款  |  常见问题  |  友情链接
Copyright © 2010-2025 www.enclive.cn All Rights Reserved  京ICP备19051564号-1 | 京公网安备 11010602006962号